PT Muara Energi Mutakhir

In the midst of climate change and global warming issues, PT Muara Energi Mutakhir (MEM) was established in 2022 with the aim of generating alternative energy to preserve the environment and the land of Indonesia, as well as realizing renewable energy as the future energy for us.

Phone: +6221 5999 5579

Paramount Centre 1 Blok A22, Jl. Gading Serpong Boulevard, Curug Sangereng, Kec. Klp. Dua, Kab. Tangerang, Banten 15138

PT Muara Energi Mutakhir

In the midst of climate change and global warming issues, PT Muara Energi Mutakhir (MEM) was established in 2022 with the aim of generating alternative energy to preserve the environment and the land of Indonesia, as well as realizing renewable energy as the future energy for us.

Phone: +6221 5999 5579

Paramount Centre 1 Blok A22, Jl. Gading Serpong Boulevard, Curug Sangereng, Kec. Klp. Dua, Kab. Tangerang, Banten 15138